Hormuz Eagle Hormuz Eagle LLC · Roads & Asphalt · Oman
Crusher and screening plant producing aggregates
Products & services

Eight service groups, one contractor

From clearing the ground to the last line of road marking, Hormuz Eagle self-performs the road: aggregates from our own crusher, hot mix from our own plant, concrete from our own batching plant, laid and compacted by our own crews and equipment.

01

Earthworks

  • Clearing & grubbing
  • Borrow excavation
  • Unclassified excavation
  • Sub-grade
  • Sub-base
  • Aggregate base course
02

Hot mix asphalt production & pavement

  • Asphalt production
  • Prime coat
  • Bituminous base course
  • Tack coat
  • Bituminous wearing course
  • Polymer Modified Bituminous Course
03

Crusher — aggregates, sand & sub-base

Our own crusher plant produces graded aggregates, sand and sub-base material for our contracts and for supply to other sites.

04

Concrete & concrete structures

  • Concrete materials and mixes
  • Reinforcing steel
  • Culverts & storm sewers
  • Irish crossing (rigid pavement)
  • Manholes and inlets
05

Slope protection & stabilization

  • Riprap
  • Filter layers and membrane
  • Gabion Box
06

Sidewalks, paved areas & curbs

  • Kerb stone
  • Pavement tiles
07

Safety barriers, signs, marking & fences

  • Roadside barriers
  • Traffic signs
  • Road marking
  • Fences and site barriers
08

Road maintenance & reinstatement

  • Milling of bituminous layer and overlaying
  • Scarifying of bituminous layer and overlaying
Grader shaping a road formation
Paving crew finishing asphalt at an industrial unit
Plant & equipment

84 units, 26 categories — all company-owned

DescriptionQty
Bull dozers2
Excavators2
Wheel loaders3
Graders3
Earthwork rollers4
Backhoe loaders3
Tippers10
Prime movers5
Light vehicles5
Water tankers3
Trucks10
Ready mixers4
Generators1
DescriptionQty
Buses2
Pickups2
Tandem rollers4
Bobcats4
Diesel tankers1
PTR rollers6
Asphalt pavers3
Dump trucks2
Hiab trucks1
Asphalt plant1
Crusher plant1
Batching plant1
Road marking machine1

Fleet as listed in the company profile. Plant is company-owned and maintained; additional units are hired in for programme peaks.

Quality management

Eight commitments on every contract

  1. 01Innovate and delight customers by achieving their expectations.
  2. 02Allocate responsibility to ensure the product meets the required standards and is reliable, robust and consistent.
  3. 03Ensure a culture of continuous improvement and quality assurance for both service and production.
  4. 04Create pride in the job through the right work ethics across all our workforce.
  5. 05Make the construction industry a desirable place to work through the quality of the workplace and the workforce.
  6. 06Learn from mistakes and resolve issues together, without blame.
  7. 07Respect the environment, communities and the people who work in the construction industry.
  8. 08Create public confidence in our ability to deliver good quality.
Health, safety & environment

Safety is the first item on every programme

The health and safety of each employee is of primary importance to us. As a company we are committed to maintaining a healthy and safe working environment, and management provides the safeguards, programmes and equipment required to reduce the potential for incidents and injuries.

To achieve this we have developed and implemented a comprehensive Health, Safety & Environmental Manual incorporating all required components of an Injury and Illness Prevention Program (IIPP). A complete copy is maintained at our corporate office and on all job sites, in written or electronic form.

HSE manual, method statements, risk assessments and toolbox-talk records are issued with tender submissions on request.

Need plant, aggregates or a paving crew?

Tell us the quantities and the dates and we will confirm availability from our own fleet.

Request a quotation
Site record

The works, stage by stage

Photographs from our own site record. Where a photograph is tied to a specific road or governorate, the caption says so.

Cutting and removal of existing pavement
Cutting and removal of existing pavement Al Amarat · Feb 2026
Grading the sub-grade to level
Grading the sub-grade to level Muscat Governorate · Feb 2026
Sub-base laid through a residential street
Sub-base laid through a residential street Muscat Governorate · Feb 2026
Prime coat applied to the base course
Prime coat applied to the base course Sultan Turki Bin Said Road · Feb 2026
Hand-spraying prime coat at the edges
Hand-spraying prime coat at the edges Sultan Turki Bin Said Road · Feb 2026
Paving crew behind the asphalt paver
Paving crew behind the asphalt paver Roadworks · Feb 2026
Rollers compacting the wearing course
Rollers compacting the wearing course Roadworks · Feb 2026
Kerb line set out to a radius
Kerb line set out to a radius Kerb works · Feb 2026
Kerb stone bedded and pointed
Kerb stone bedded and pointed Kerb works · Feb 2026
Formwork and reinforcement to a drainage run
Formwork and reinforcement to a drainage run Concrete works · Feb 2026
Concrete channel cast in place
Concrete channel cast in place Concrete works · Feb 2026
Field density testing of the compacted layer
Field density testing of the compacted layer Muscat Governorate · Feb 2026
Core sampling of the finished asphalt
Core sampling of the finished asphalt Al Batinah South · Feb 2026
Crushing and screening plant in production
Crushing and screening plant in production Company crusher
Marini asphalt plant, mixing tower